A collection of photos showing our 11-month long process of transforming a 2001 Fleetwood Prowler into the Toaster.
Read MoreOur post from January 26 talked about us working on the kitchen floor beams and sub-floor. Since then we've worked on a variety of things and finally came back to actually finishing the sub-floor. We had left the sub-floors not glued to floor beams because we had to run the electrical wires and water pipes below the sub-floor first.
Read More